PHASE 2 PROJECT PHOTOS – CONSTRUCTION PHOTOS

Laying out block at the 1st floor IT Room Facing South.jpg Set the door frames at the 1st floor Atroneys Room Facing East.jpg Started installing Stair -3 Facing West.jpg Installing Exterior metal framing at the 2nd floor Facing West.jpg Installing motorized dampers at the 1st floor Facing North.jpg Installing sprinkler branches-heads at the 3rd floor Facing West.jpg Laying out block at the 2nd floor detention cells facing South.jpg Metal tracks for the 2nd floor exterior framing Facing West.jpg
Previous pageNext page Installing Exterior metal framing at the 2nd floor Facing West
Installing Exterior metal framing at the 2nd floor Facing West